Alleviating Storm and Sewage Concerns on Staten Island’s West Shore

Project: REI Services for the Reconstruction of Storm Sewers in Travis Area (SER200226)
Services: Resident Engineering Inspection (REI)
Location: Staten Island, NY
Owner: New York City Department of Design and Construction (NYCDDC)
Construction Cost: $33M

Residents of the Travis neighborhood on Staten Island have been affected in recent years by flooding from storm surges and sewage overflows, which have been exacerbated by aging pipes and limited stormwater infrastructure. EnTech recently provided construction inspection and coordination for a $33M project to provide much-needed drainage upgrades for this primarily residential area, including new storm sewers, sanitary sewers, and water mains.

Entrance to BMP area during construction
Jute mats and root barriers within the BMP area

EnTech, as part of the resident engineering inspection (REI) team, monitored the installation of more than 8,400 LF of new storm sewers along Victory Boulevard and adjoining streets, 90 new and 14 replacement catch basins, 6 cast-in-place storm sewer chambers, and 1 precast chamber. The team oversaw the installation of more than 20,000 LF of distribution water main made of concrete-lined ductile iron pipe, which replaced older cast iron pipes that were prone to cracking, as well as the replacement of lead water services with copper pipe. The team additionally oversaw the replacement of 50 fire hydrants, the addition of 11 new hydrants, the installation of new sidewalks, and the repaving of more than 44,000 SY of roadway. The project was completed on schedule.

Newly constructed Bluebelt wetland

A major component of the project was the construction of a new 1-acre Bluebelt wetland along the western edge of the project area, as part of a Best Management Practice (BMP) area for stormwater management. The Bluebelt stores and filters stormwater and directs it away from structures and toward a nearby wetland, through which it empties into Arthur Kill. The EnTech team was responsible for supervising the implementation of the BMP and the construction of the Bluebelt, which included maintaining a 24-hour reaction and settling tank, installing silt fence surrounding the wetland, placing riprap in graded areas to prevent erosion, and planting. EnTech staff contributed to the resolution of several project challenges, including the redesign of storm sewer alignments and elevations in a stretch where the planned alignment interfered with an existing sanitary sewer force main.

Related News

Tide Gate Bridge Reconstruction Earns Award for Outstanding Use of Technology

Megan Salazar Selected for 20 Under 40 Award by PWC NY

EnTech Builds Connections With Emerging Businesses in Coastal and Waterfront Sector

EnTech Celebrates 25 Years of Successful Collaboration

EnTech Named a Top 50 Construction Management Firm by Engineering News-Record

EnTech Ranked Among Top Design Firms in East Region by Engineering News-Record

132nd Street Extension Project Brings Transportation Improvements to College Point

Park Life: Celebrating EnTech’s Work with New York City Parks

Henry Hudson Bridge Project Wins Engineering Excellence Award

EnTech Green Infrastructure Project With NHSA Wins Engineering Excellence Award

Two Projects Receive ASHE New York Metro Project of the Year Awards

EnTech Announces Key Additions to Claims Resolution Team

Pierce Reynoldson, AIA
Vice President, Technology & Education
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.