GET IN TOUCH

Infrastructure Week Spotlight: Reconstruction of Five Bridges within Croton Watershed

Project: Demolition of Three Bridges and Reconstruction of Two Bridges (CRO-530-DES)
Services: Design and Design Services During Construction, Environmental Permitting, Hazardous Materials Surveys, Soil Investigations
Location: Westchester County, NY
Owner: New York City Department of Environmental Protection (NYCDEP)
Construction Cost: Package A $5.1M, Package B TBD

This NYCDEP project involved the demolition of three bridges and the reconstruction of two existing bridges located within the Croton Watershed area of Westchester County due to the poor condition of their existing superstructure, low road ratings, and substandard features. This project featured services for two contract packages (A&B). Package A included the demolition of the Dean’s Bridge, the Lakeside Road (Katonah) Bridge, and the Plum Brook Bridge. Package B consisted of reconstruction and/or replacement of the Cross River Inlet Bridge and the Baptist Church Road Bridge. 

As a subconsultant to Hardesty & Hanover, EnTech’s scope of work required permit management, environmental sampling, completion of hazardous materials inventory, document review, and CEQR/SEQRA classification.  

Our team of environmental scientists and engineers worked closely with the NYCDEP to oversee the environmental permitting aspects of the project, regulatory agency coordination, and preparation of environmental assessments.

Specific tasks completed by our team include: preparation of necessary documents related to the NYC Environmental Quality Review Act (CEQR) and NYS Environmental Quality Review Act (SEQR), completion of the Environmental Assessment Statement Full Form, preparation of the Joint Permit Application Form for NYSDEC and USACE, SHPO Consultation, attending local town planning board meetings, conducting a soil and groundwater survey, hazardous materials survey, and preparation of a Stormwater Pollution Prevention Plan (SWPPP) for each location. 

Currently, EnTech is working with the design team and NYCDEP to obtain the final permits prior to construction in the Fall of 2023.

Related News

Tide Gate Bridge Reconstruction Earns Award for Outstanding Use of Technology

Megan Salazar Selected for 20 Under 40 Award by PWC NY

EnTech Builds Connections With Emerging Businesses in Coastal and Waterfront Sector

EnTech Celebrates 25 Years of Successful Collaboration

EnTech Named a Top 50 Construction Management Firm by Engineering News-Record

EnTech Ranked Among Top Design Firms in East Region by Engineering News-Record

132nd Street Extension Project Brings Transportation Improvements to College Point

Park Life: Celebrating EnTech’s Work with New York City Parks

Henry Hudson Bridge Project Wins Engineering Excellence Award

EnTech Green Infrastructure Project With NHSA Wins Engineering Excellence Award

Two Projects Receive ASHE New York Metro Project of the Year Awards

EnTech Announces Key Additions to Claims Resolution Team

Pierce Reynoldson, AIA
Vice President, Technology & Education
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.